Business

XINFENG NAMIBIA INVESTMENT COMPANY

 

It has 7 main mines
Mining right

It is headquartered in Windhoek, Namibia. In 2022, the mining rights of seven mines have been obtained, of which the main mining mining rights are 20 years. The mining area is located in the northwest of Namibia, covering a total area of about 200,000 hectares, located in the world's largest reserves, high grade lithium veins, preliminary detection of lithium deposits of about 60 million tons. The company annually mines about 1.5 million tons of lithium raw ore, which is about 300km away from Walvis Bay Port and has convenient transportation conditions. From August 2022 to December 2022, a total of 124,000 tons of raw lithium ore were shipped, and the first ship of African lithium raw ore arrived at Caofeidian Port in October 2022. In March 2023, the port has accumulated 30,000 tons of lithium raw ore, which will be shipped at the end of March. The construction of a Namibian concentrator in 2023 will lay a solid foundation for Xinfeng Lithium concentrate processing, and will also open a new pattern of new energy development in the region.

Founded in

2021

Total floor area approx

200,000hectares

Lithium raw ore about

1.5million tons

 

It has 7 main mines
Mining right

It is headquartered in Windhoek, Namibia. In 2022, the mining rights of seven mines have been obtained, of which the main mining mining rights are 20 years. The mining area is located in the northwest of Namibia, covering a total area of about 200,000 hectares, located in the world's largest reserves, high grade lithium veins, preliminary detection of lithium deposits of about 60 million tons. The company annually mines about 1.5 million tons of lithium raw ore, which is about 300km away from Walvis Bay Port and has convenient transportation conditions. From August 2022 to December 2022, a total of 124,000 tons of raw lithium ore were shipped, and the first ship of African lithium raw ore arrived at Caofeidian Port in October 2022. In March 2023, the port has accumulated 30,000 tons of lithium raw ore, which will be shipped at the end of March. The construction of a Namibian concentrator in 2023 will lay a solid foundation for Xinfeng Lithium concentrate processing, and will also open a new pattern of new energy development in the region.

Founded in

2021

Total floor area approx

200,000hectares

Lithium raw ore about

1.5million tons

 
google-site-verification=glm0rZEAgtLIHDvJgOGjaQCEKT3OqYy-Dob4Ehe74gg